• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name hyde

    Log entry time 10:02:20 on October 18, 2010

    Entry number 335450

    This entry is a followup to: 335210

    keyword=S1.and.S2 timing into T3: Correction

    The conclusion on the previous entry (335210) was erroneous. This TDC is common stop, so later events generate smaller TDC counts. (-)t(S1) - (-)t(S2) =100 TDC counts S2 is later by 50 ns as expected. T3 timing is driven by S2