    Swing Shift Summary: 16:00 - 24:00 Nov. 3, 2010

    Shift Crew

    SL: Yi Qiang
    TO: Min Huang
    Replay: Pengjia Zhu

    Shift Summary

    16:00 Shift starts with production run 8290 with 3 μA beam on 15 cm LH2 target, DAQ configuration TrigDVCSBuff.
    17:45 Hall B took our beam away for a 30 minute test.
    18:32 Continue production, very smooth production.
    24:00 Shift ends with production run 8299 being taken.

    Run Summary

    Kinematics 3: Low energy
    PHRSL = 1.494 GeV/c
    θHRSL = 31.82°
    θCAL = 14.78°
    CAL dist. = 1.1 m

    Run # Type Target Current Event # Comment
    8290 Production 15 cm LH2 3 μA 427k Kin3, Config: TrigDVCSBuff, T5 only
    8291 Production 15 cm LH2 3 μA 288k  
    8292 Pedestal     31k  
    8293 Junk        
    8294 Production 15 cm LH2 3 μA 436k  
    8295 Production 15 cm LH2 3 μA 434k  
    8296 Production 15 cm LH2 3 μA 478k  
    8297 Production 15 cm LH2 3 μA 357k  
    8298 Production 15 cm LH2 3 μA 352k  
    8299 Production 15 cm LH2 3 μA -