• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name efuchey

    Log entry time 14:16:11 on November14,2010

    Entry number 340046

    keyword=Target switch

    Target switch to LH2;
    the Loop 1 JT valve has been closed from 29 % to 22.5 % meanwhile the Loop2 JT valve has been opned from 27 % to 29.5 %


    FIGURE 1