• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name S. Sirca

    Log entry time 20:38:10 on November22,2010

    Entry number 341321

    keyword=Beam current fluctuations

    Called MCC to see whether they can calm down the fluctuations
    of the beam currents (at times reaching 4 uA) since one of our
    feedbacks (energy/RF) says "OFF". MCC reply that this
    "is by design", by which they probably meant Hall C
    was locked and not us.


    FIGURE 1