    User name yez

    Log entry time 18:15:12 on February 02, 2011

    Entry number 346049

    keyword=L-HRS: Cosmic Ray run restuls update

    I analyzed the cosmic run we took in this week. I found several problems
    and tried to fix them. Here is the details:
    
    1, VDC,PR1,PR2 are all working fine
    
    2, S1.ADC.#1R is empty because it was connected to a scope but not ADC
    module.  *FIXED*
    
    3, S1.TDC.#1R/#2R/#3R are empty because the connector of the cable to TDC
    module is fliped. *FIXED*
    
    4, S2m.ADC.#10L~#16L, the connector was loose. *FIXED*
    
    5, Cer-TDC, all channels have no peaks, because the signals were not
    delayed before they being sent into 1875TDC. We will put the cable into
    1877TDC.
    
    6, S2m.TDC.#3R is empty since the Level Translator (Crate#2,Slot#5) has a
    bad channels at #3. Need to replace the Level Translator or fix it.
    
    