NEXT
Make New Entry,
Make Followup Entry
User name V. Sulkosky
Log entry time 15:45:10 on February 03, 2011
Entry number 346054
keyword=L-HRS Cables connected to Weldment Patch Panel
I connected the RG-8 and RG-58 cables from the Left arm to the BigBite
weldment patch panel. The cables still need to be connected on
the
left arm side. The handshake cables (RS-485) will be tested to
make
sure they have no problems. Here is the cable map:
RG-58:
Label Description Location
+++++++++++++++++++++++++++++++++++++++++++++++++++
1 T8 (1024 Hz clock) From LHRS
2 spare
3 RF time 1 From LHRS
4 RF time 2 From LHRS
5 EDTM pulser To LHRS
6 Fast clock (104 kHz) From LHRS
7 spare
8 spare
We can use one of the spares to send the scaler run gate to the left arm
and another to send a BCM signal for the BigBite Scalers.
RG-8:
Label Description Location
+++++++++++++++++++++++++++++++++++++++++++++++++++
T2/R T3 (left arm) From LHRS
T4 T4 (left arm) From LHRS
T7 Level 1-Accept To LHRS
T2/L spare
L1A Bad connector
T3 Bad connector
A copy of this log entry has been emailed to: lselvy,rom,nmuangma,danez,yez