• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name V. Sulkosky

    Log entry time 15:45:10 on February 03, 2011

    Entry number 346054

    keyword=L-HRS Cables connected to Weldment Patch Panel

    I connected the RG-8 and RG-58 cables from the Left arm to the BigBite
    weldment patch panel. The cables still need to be connected on the
    left arm side. The handshake cables (RS-485) will be tested to make
    sure they have no problems. Here is the cable map:
    RG-58:
    Label            Description           Location
    +++++++++++++++++++++++++++++++++++++++++++++++++++
    1            T8 (1024 Hz clock)        From LHRS
    2            spare     
    3            RF time 1                 From LHRS
    4            RF time 2                 From LHRS
    5            EDTM pulser               To LHRS
    6            Fast clock (104 kHz)      From LHRS
    7            spare
    8            spare
    
    We can use one of the spares to send the scaler run gate to the left arm
    and another to send a BCM signal for the BigBite Scalers.

    RG-8:
    Label            Description           Location
    +++++++++++++++++++++++++++++++++++++++++++++++++++
    T2/R             T3 (left arm)         From LHRS
    T4               T4 (left arm)         From LHRS
    T7               Level 1-Accept        To LHRS
    T2/L             spare
    L1A              Bad connector
    T3               Bad connector
    


    A copy of this log entry has been emailed to: lselvy,rom,nmuangma,danez,yez