The eight RG58 and four RG8 handshake cables from the BigBite weldment to the Left HRS have been connected to a patch panel at the bottom of RR3. There are no labels on the patch panel yet, but the layout is an exact copy of Vince's layout in the weldment. (There may be some cables in the wrong location, as the labels on the cables themselves are difficult to read. Testing of the cables will occur as soon as possible.)