• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name danez

    Log entry time 19:08:48 on February 07, 2011

    Entry number 346137

    keyword=LHRS Retiming (and RHRS Retiming)

    Everything on the left arm, except FPP, looks good. The L1A from the BB Weldment arrives, is delayed, and goes into the RT module with the strobe. The outputs from that go into the TM, and the ADC gates then created seem to fit very well with the ADC signals.

    Once the connectors for the new RG8 cables come in and are attached, the BigBite weldment can be connected to the right arm, the L1A can be delayed (if necessary), and we should have good results for both arms.