• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name V. Sulkosky

    Log entry time 09:38:24 on February 11, 2011

    Entry number 346364

    This entry is a followup to: 346338

    keyword=Updated t1_delay script

    I updated the t1_delay script to delay T1 appropriately at the weldment to
    form the coincidence between left and right HRS in the 4518/300 unit.
    
    The script is located in a-onl/bbite/bin/t1_delay
    
    Usage:
    
    ./t1_delay Chan0 Chan3
    
    where Chan0 is the delay value in ns for channel 0 and Chan3 is the delay
    value in ns for channel 3, i.e., T1 goes into channel 0 is delayed and is
    routed through channel 3 for additional delay.
    
    For D-threshold, the setting should be
    
    ./t1_delay 120 32
    
    This will delay T1 wrt to T3 by about 150 ns so that T1 is about 38 ns
    after the falling edge of the T3 signal.  I reduced the settings from
    the post I made last night.  In time, I will make a script that
    automatically downloads the trigger for each coincidence kinematic.
    
    I will update a similar script for T3 for when T3 is the electron arm.
    


    A copy of this log entry has been emailed to: doug,brads,eip,gron,nmuangma,orchen,igorko,lselvy,rom,danez,yez