As per Vince's request, a copy of the RF time signal from the left HRS was connected to the BigBite weldment via the RG58 cables labeled 1 and 2 (at the BigBite weldment patch panel). The signal to cable 1 was delayed approximately 80ns.
A copy of BCM Ux10 from the right HRS was connected to the BigBite weldment via the RG58 cable labeled "orange".