Cables for T5, T6, and T7 from the BigBite weldment were connected from the handshake patch-panel to the Triggers scaler as T5, T6, and T7.
Specifically, T5 runs from the 3rd wire, T6 from the 4th wire, and T7 from the 8th wire in the patch-panel that connects the right arm to the BigBite weldment. They are all plugged into a NIM-ECL fanout in the top NIM crate of RR3, where the rest of the triggers and other miscellaneous information signals enter and are taken out to both a TDC and a scaler.
The new signals can be checked by viewing the scalers on the right arm in the Normalization screen with the other triggers and miscellaneous signals, such as the ADC gates and the L1A.
Please note that, as of this writing, the actual trigger signals from the BigBite weldment still need to be connected to the patch-panel in the weldment.