Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name danez
Log entry time 13:53:34 on February13,2011
Entry number 346679
keyword=T1 and T2 connected to LHRS Scalers
T1 and T2 were connected to the left arm scalers via the RG8 handshake cables connecting the arms. T1 was plugged into the cable labeled 1 and T2 was plugged into 2, via the patch-panel which connects all of the signals from the right arm to the BigBite weldment, with T1 connecting through the port on the very left, and T2 immediately to the left of that. Both ports were labeled, T1 L and T2 L respectively.
On the left arm, both signals were connected to the NIM-ECL module (top NIM crate, RR3) where the rest of the triggers go (including T5, T6, and T7 from yesterday), into the ports for T1 and T2.
This means that the xscaler display for the Left arm now correctly shows all the triggers, from T1 to T8, in the Normalization window.