    User name Fansler

    Log entry time 10:37:30 on February 14, 2011

    Entry number 346833

    keyword=LQ1 Ramped down

    There were some problems with the Q1 liquid level stability over the weekend, cryo is making adjustments to the control loop. Leave the magnet ramped down until we are finished.The adjustments may cause a loss of liquid level and as a result trip the magnet.