    Day shift summary

    Shift workers: J. P. Chen (SL), N. Sparveris (TO), E. Long (3rd).

    8:00 shift started with CODA problem. Previous shift reset and got it back.
    8:15 No beam, MCC called that problem with injector RF. they siad that at least one hour no beam. Stopped run.
    8:30 Beam back. Start new run. Calibration run for the neutron detector
    9:00 stop beam, planned access.
    9:10 started sweep.
    9:45 go into restricted access.
    16:00 still in restricted access.

    run 1311-1313, 8:06, problem with coda.
    run 1314 8:15-8:24, 1uA on 4 cm LH2, 10.9 M
    run 1315 8:50-9:00, 1uA on 4 cm LH2, 11.6 M