Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name jpchen
Log entry time 16:15:28 on February14,2011
Entry number 346883
keyword=shift summary
Day shift summary
Shift workers: J. P. Chen (SL), N. Sparveris (TO), E. Long (3rd).
8:00 shift started with CODA problem. Previous shift reset and got it back.
8:15 No beam, MCC called that problem with injector RF. they siad that at least one hour no beam. Stopped run.
8:30 Beam back. Start new run. Calibration run for the neutron detector
9:00 stop beam, planned access.
9:10 started sweep.
9:45 go into restricted access.
16:00 still in restricted access.
run 1311-1313, 8:06, problem with coda.
run 1314 8:15-8:24, 1uA on 4 cm LH2, 10.9 M
run 1315 8:50-9:00, 1uA on 4 cm LH2, 11.6 M