Cryo has been tweaking the valves for the Left Dipole and Q1, Dipole is filling up it is at around 50 %, Q1 should fill up quickly once the dipole is full. So maybe about 1 hour or so. If the problem persists we might take beam for BPM calibration, do right arm and left arm singles to fix the missing channels, while the magnets are filling up.