The Gas Cherenkov counter in the Left Arm was moved out of the way during the Beam Studies on Tuesday. It was moved off to the left side of the Detector Stack on two short rail extensions. Due to the cable routings we had to turn off the HV and disconnect the SHV and BNC cables from the counter. I was a bit distracted and forgot to note this in the halog.