    Log entry time 23:58:47 on February20,2011

    Entry number 347881

    Followups:

    keyword=swing shift summary

    Swing Shift Summary:

    Navaphon Muangma
    Kai Pan
    D. Margaziotis

    4:00 Move target to BeO.
    4:50 Move target to Al-4cm dummy
    5:20 Move target to Al-15cm dummy
    The beam was down for 20 mins
    7:55 Move target to LD2-15cm
    8:00-32 requested access for timming.
    8:40 Production
    11:50 changing configuration for CODA.




    Run Target Description
    1633 BeO check prescale
    1634 BeO T1=T3=100Hz, T2 = 10Hz, Ps5=1
    1635 BeO T1=T3=100Hz, T2 = 10Hz, Ps5=1
    1636 Al-4cm check prescale
    1637 Al-4cm T1=T3=100Hz, T2 = 10Hz, Ps5=1
    1638 Al-4cm T1=T3=100Hz, T2 = 10Hz, Ps5=1
    1639 Al-15cm check prescale
    1640 Al-15cm T1=T3=100Hz, T2 = 10Hz, Ps5=1
    1641 Al-15cm T1=T3=100Hz, T2 = 10Hz, Ps5=1
    1642-3 Carbon optics
    1644 junk
    1645 LD2-15cm prescale check
    1646 LD2-15cm production
    1647 LD2-15cm production
    1648-1650 testrun
    1651-1657 LD2-15cm Production
    configuration change from twoarms to threearms
    1658: LD2-15cm Production