Make Followup Entry
User name NMuangma
Log entry time 23:58:47 on February20,2011
Entry number 347881
Followups:
keyword=swing shift summary
Swing Shift Summary:
Navaphon Muangma
Kai Pan
D. Margaziotis
4:00 Move target to BeO.
4:50 Move target to Al-4cm dummy
5:20 Move target to Al-15cm dummy
The beam was down for 20 mins
7:55 Move target to LD2-15cm
8:00-32 requested access for timming.
8:40 Production
11:50 changing configuration for CODA.
Run Target Description
1633 BeO check prescale
1634 BeO T1=T3=100Hz, T2 = 10Hz, Ps5=1
1635 BeO T1=T3=100Hz, T2 = 10Hz, Ps5=1
1636 Al-4cm check prescale
1637 Al-4cm T1=T3=100Hz, T2 = 10Hz, Ps5=1
1638 Al-4cm T1=T3=100Hz, T2 = 10Hz, Ps5=1
1639 Al-15cm check prescale
1640 Al-15cm T1=T3=100Hz, T2 = 10Hz, Ps5=1
1641 Al-15cm T1=T3=100Hz, T2 = 10Hz, Ps5=1
1642-3 Carbon optics
1644 junk
1645 LD2-15cm prescale check
1646 LD2-15cm production
1647 LD2-15cm production
1648-1650 testrun
1651-1657 LD2-15cm Production
configuration change from twoarms to threearms
1658: LD2-15cm Production