    User name ellie

    Log entry time 16:02:21 on February 21, 2011

    Entry number 347972

    keyword=Day Shift Summary

    02/21/11 Day Shift Summary

    On shift:
    SL: Ellie Long
    TO: Kai Pan
    3rd: Sasha Glamazdin


    · 08:00 Good morning, Hall A! Starting shift in Production with Run # 1665

    · 09:03 Problems with ROC hangups, restarting CODA - affects Run # 1666

    · 09:32 Configuration change to dThresh2arm

    · 10:45 Target computer window manager crashed. Logged out and logged back in fixed it

    · 10:51 Some scintillator paddles (top and bottom) in RHRS

    · 11:20 Beam down due to a cavity problem in the injector

    · 11:30 Beam returns! Asking for 30uA

    · 11:35 Methane Gas Shed alarm sounded twice. Was told by RC that the alarm is faulty and to just reset it, so it was reset

    · 11:47 Beam back down due to that cavity problem

    · 11:50 Having problems with RHRS shower HV in S8 L8.4. It keeps tripping. Lowered voltage from -777 to -750 and it's still throwing errors. Lowering it to -650 fixed it

    · 14:18 Beam is still down. Called MCC - no ETA for beam returning

    · 16:00 Ending shift with no beam. Good luck, Swing Shift!




    Good Runs:

     Run #  Current (uA)  Events  Comments 
    1665 23 2M
    1667 23 1.2M Run ended early to change configuration
    1669 23 1.1M
    1670 23 350k Test Run (see HALog 347955)
    1671 23 686k Test Run
    1672 23 791k Test Run
    1673 23 749k Test Run - Top and Bottom paddles on RHRS turned off
    1674 23 4k Test Run - Beam down - Cavity Problem in Injector
    1675 30 292k
    1676 0 84k Cosmics
    1677 0 860k PS7=1, all others=0
    1678 0 0.9 M PS7=1, all others=0
    1679 0 950k PS7=1, all others=0
    1680 0 925k PS7=1, all others=0




    Junk Runs:

     Run #  Comments 
    1666CODA crash
    1668Config Change