Moved to bottom, polarizing positively.
MCC tuned beam into the hall and found IPM1H01 to be off by 3mm in X relative to the settings before moller. All of the beam position values have been updated. They also noticed the BPM saturated while doing the harp scan so the gains are likely set too high.