Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name pzhu/Chao
Log entry time 17:40:57 on April 03, 2012
Entry number 369610
This entry is a followup to: 368048
keyword=Replaced the bad NIM to BNC convertor for left arm BCM signal
Pengjia and I checked the upstream BCM signal of left arm. It looks like
a bad NIM to BNC convertor changed the shape of the signal. So we
replaced it. We checked the signal with oscilloscope, it looks good now.
We will check it again after the beam back.
A copy of this log entry has been emailed to: pzhu,cg2ja,jixie