Shift Summary Swing Shift - Tuesday, April 3rd
Shift Crew:
SL: Guy Ron
TO: Ryan Zielinski
3rd: Paul Gueye
Shift Summary:
0:00 - Started shift in production mode on P=1.729 GeV/c
1:05 - Finished production runs on the P=1.729GeV/c kinematic. Switching to dilution runs.
1:47 - Finished dilution runs. Moving to the 1.608 GeV/c kinematic.
2:35 - MCC called. They had a HV drop on one of the cavities. Will be down for about 10 minutes.
2:55 - Got beam back. Spot still looks good so we're not reentering the beam, but rather keep taking data.
4:00 - Hall C let us know that they're changing HWP in 5 minutes.
8:00 Shift ends with ~146M events, but due to the drop in polarization we should run this kinematic to ~162M.