    User name Boeglin

    Log entry time 16:07:57 on April 6,2012

    Entry number 370815

    keyword=Day shift summary

    8:00 continue prod. run 22816/6793/40871
    8:27 finish runs, next dilution runs
    8:34 Carbon C12-40
    8:43 Dummy target in place, no beam (RF promlems) expected delay 15 min
    9:15 beam back continue with dilution on dummy target
    9:30 finished dilution runs with home position, switch to new kinematics
    10:00 Target magnet quench
    11:10 Hall back in power permit. Getting ready for tuning
    11:27 Problem with resetting the FSD trip due to the target magnet.
    Require a controlled access to check the system.
    11:45 access finished, no problem found => software problem in MCC ?
    11:28 decided to skip Moeller and get ready for beam recovery for production
    13:15 start beam recovery
    13:50 beam recovery completed, polarizing target
    15:00 polarization complete: 44.8%
    15:04 start poduction running on new kinematics p = 1.496 GeV/c


    Dilution runs p = 1.608
    Carbon 12C-40: 3794/22817
    Dummy : 3786/22819
    Home/empty: 3787/22820

    Production runs p = 1.496
    3808/22831/40881 18M events
    3809/22832/40882 4M events (ended early due to 1/2 wave plate change)