    User name hyao

    Log entry time 00:04:58 on April 7,2012

    Entry number 370962

    Followups:

    keyword=Swing Shift Summary

    SL: Huan Yao
    TO: Chao Gu
    3rd: Vina Punjabi


    Plan: Take production with P0=1.496 and 1.391


    16:00 1/2 Wave is out.
    17:50 Right Arm ps1 from 2 to 1 as suggested by RC. Deadtime is 32%.
    19:47 Start to do dilution runs. Target moved to C12_40
    19:51 Bleed-through = 0.5%
    20:00 Melissa do T2 test on carbon target
    20:35 Target to dummy
    20:45 Target to HOME
    21:15 Target to top NH3
    21:29 P0=1.391, Pol=35% without beam, 31% in beam(estimation)
    21:32 Ask beam for 50nA, start taking production.
    22:31 MCC start to do Qweak halo test. Maybe take one hour.





    Run Nevt(M) IHWP Good Comment
    P=1.496
    3810/22833/40883 O N Pion-rejector HV is off
    3811/22834/40884 10/8/5 O Y
    3812/22835/40885 9/8/5 O Y
    3813/22836/40886 O N Deadtime=45%
    3814/22837/40887 8/10/5 O Y
    3815/22838/40888 8/10/5 O Y
    3816/22839/40889 8/9/4.4 O Y
    3817/22840/40890 6/7/4 O Y

    Dilution Runs
    3818/22841/40891 1/1/0.2 O Y Carbon
    3819/22845/40893 1/1/0.2 I Y Dummy
    3820/22846/40894 1/1/0.2 I Y Empty

    T2 test Runs
    22842 1 T1 only
    22843 1 T2 only
    22844 1 T1+T2

    P=1.391
    3821/22847/40895 8/10 I Y
    3822/22848/40896 5/6/0.2 I Y
    3823/22849/40897 8/10/0.4 I Y On DAQ, 22849 is still 22848
    22850 I N Junk. Only DAQ check
    3824/22851/40898 8/10/0.5 I Y
    3825/22852/40899 I N Junk. DAQ dead.