Yoomin Oh(SL), Paul Reimer(TO), Jie Liu(3rd)
00:00 Shift starts, P0=0.8987
01:25 Target Polarization dropped to 0 and recovered to 25.5%.
02:05 P0 set to 0.8448
03:00 HWP OUT.
04:15 TO suggest to re-polarize the target.
Polarization now 30%.
05:20 Quick bleed-through rate check.
07:15 HWP IN.
07:30 Beam energy fluctuates with Hall C current.
08:00 P0=0.8448 GeV finished. ~233 M events total.
Go to 0.7941
GeV
Over.
4885 : 7M
4886 : 7M
4887 / 23774 : 6.3M / 5.4 M, ended due to HWP flip
4888 / 23775 : 7M / 6.2M
4889 / 23776 : 7M / 5.3M
4890 / 23777 : 7M / 6.1M
4891 / 23778 : 3.7M / 3.3M, stopped to re-polarize the target
4892 / 23779 : 7M / 6.1M, 30% polarization
4893 / 23780 : 7M / 6.1M
4894 / 23781 : 7M / 6.4M
4895 / 23782 : 7M / 6.5M, subtotal 124M
4896 / 23783 : 7M / 6.2M
4897 / 23784 : 7M / 6.2M
4898 / 23785 : 7M / 6.3M
4899 / 23786 : 7M / 6.3M
4900 / 23787 : 7M / 6.1M
4901 / 23788 : 2.1M / 1.8M, HWP flip
4902 / 23789 : 7M / 6M, Tiefenbach fluctuating.
4903 / 23790 : 7M / 6M
4904 / 23791 : 7M / 6.2M, The last production runs for this setting.