    User name Chao

    Log entry time 16:15:01 on April 25, 2012

    Entry number 378998

    keyword=Day shift summary

    Shift workers:
    Chao Gu(SL), Navaphon Muangma(TO), Eric Jensen(3rd)
    
    08:00 Shift starts with production at 1.082GeV momentum setting.
    08:50 3rd arm saw a >10k rate. We did a 10 min quick study on beam
    position and slow raster size. Change back to what we used on Saturday
    (0.62VX0.80V). New beam position is BPMA(1.2,-5.0) BPMB(0.3,-4.0)
    09:00 Hall C is down for 15 min. Our beam energy changed during this
    time. Talk with MCC, they suggests us to wait Hall C back. Beam energy is
    recovered at 9:15
    10:50 Finished production on 1.082GeV, moved HRS momentum to 1.0063GeV
    11:00 Start production at 1.0063GeV
    12:35 Bleed through test, the result is 0.33%
    14:00 Moved to Top cell, polarized it to 45% and continue with production
    16:00 Shift ends. We were still taking 1.0063GeV momentum production data.
    
    Production Run# at 1.082GeV (115M in total)
    5038/23899/41676
    5039/23900/41677
        /23901/41679
        /23902/41680 (LHRS CODA problem)
    5044/23903/41681
    5045/23904/41682
    
    Production Run# at 1.0063GeV
    5047/23905/41684
    5048/23906/41685
    5049/23907/41686
    5050/23908/41687
    5051/23909/41688
    5052/23910/41689
    5053/23911/41690
    5054/23912/41691
    5055/23913/41692
    (several short runs during the beam trip)
    5058/23916/41695