• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Adaq

    Log entry time 08:06:48 on October 24,1998

    Entry number 3418

    keyword=Delay in doing arc energy measurement

    We wanted to do the arc energy measurement at 8. The position and
    energy feedback are needed for the arc measurement. MCC says that
    the energy feedback is not working. Called Arun and he said that MCC
    should call Lebedev. Asked MCC to at 8:00.
    Informed Hall B about delay.