    User name slifer

    Log entry time 23:47:54 on October 27,1998

    Entry number 3894

    keyword=shift sum

    16:00-17:12 2.382 Gev //
    17:12-17:42 target NMR and field rotation.
    17:42-18:00 beam to hall then rf trip
    18:00-18:20 accelerator checklist
    18:20-18:35 field rotation, laser
    1835-18:54 raster/ target warmup
    1854 -19:4614uA production run for 2.382 Gev |_ 5Mevents
    19:46-20:04 accelerator lost a power supply beam dwn
    20:04-20:14 beam restord raster/5-10uA warmup
    20:15 accelerator lost box supply again when attempting 14uA
    20:15-20:56 beam down.
    20:56-21:04Beam restored 1uA raster
    21:04 -21:25 target NMR &Moeller setup
    21:25-22:13 Moeller
    22:13-22:23 target movement,field rotation
    22:23-22:43 raster runs, target warmup
    22:43-midnight 14uA for 2.382 perp.