    User name adaq

    Log entry time 00:03:32 on February 21, 1999

    Entry number 15001

    keyword=Beam Time Accounting
    Hall A

    2/20/1999 1600-2400
    Experiment #: E95-001
    Shift Leader: m finn
    Shift Workers: I . Kominis, B. Tipton

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    45 30 1 1 1 1 1 1 7.25
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    15 30 0 0 0 0 0 0 0.75
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1 1 1 1 1 1 1 1 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: 16:45 begin system checks 17:15 begin NMR calibrations. 17:28 request beam back, start with 3 mircroamps on reference cell for spot check, target spin angle isnow set at 62.5 degs. target pol is 34.67% 17:31 beam back 18:30 changing to pol 3He cell 19:20 Happex parasitic runs begin 23:10 begin neutron detector studies hadron arm kinematics changed to 1..62 Gev 23:50 finish parasite run moving hadron arm back to 1.725 gev

    Data Entry by: m. finn