• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name M Jones

    Log entry time 16:27:59 on April 7,2000

    Entry number 37993

    keyword=Shift log

    8:00 Access for resetting hadron Q2. While inside electron dipole trips.
    Both reset.
    9:30 Ask for beam back. MCC to do program of "Characterizing the Moller Quads"
    since Moller quads have new power supplies.
    12:30 MCC probably done with characterizing the Moller quads .
    MCC starting to retune entire accelarator, maybe 3 hrs.
    4:00 No beam still tuning
    PLan is to do arc, then Moller, then take data.