• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 10:36:31 on April 8, 2000

    Entry number 38078

    keyword=Beam Time Accounting
    Hall A

    4/8/2000 0000-0800
    Experiment #: E93-049
    Shift Leader: ent
    Shift Workers: ireland, meekins

    00000100020003000400050006000700Total Time
    Acceptable Beam
    in Use
    0 0.5 0 0 0.5 0.5 0.1 1.0 2.6
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    1.0 0.5 1.0 1.0 0.5 0.5 0.9 0 5.4
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 8
    Planned Config-
    uration Change
    0 0 0 0 0 0 0 0 0
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Initially trial/error to determine Moller quad polarities 0.5 hour tuning between 1 am and 2 am, 1 hour measurements after 4 am Polarization 66%, PD doesn't want to change Wien filter, i.e. stay there. 6 am waiting for non-Moller beam to start, then our beam position checks again, discrepancy between MCC (0,0) and spot (0,0).....

    Data Entry by: ent