1600 | 1700 | 1800 | 1900 | 2000 | 2100 | 2200 | 2300 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0 | 0 | 0 | 0 | 15 | 1 | 1 | 1 | 3.25 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Beam Not Available or Unacceptable | 1 | 1 | 1 | 1 | 45 | 0 | 0 | 0 | 4.75 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 0 | 0 | 0 | 0 | 15 | 1 | 1 | 1 | 3.25 |
Planned Config- uration Change | 1 | 1 | 1 | 1 | 45 | 0 | 0 | 0 | 4.75 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Acq | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: Start of the shift during the target change. During the change a venting of Hadron Q1 was seen. Ed Folz et at. was called in and fixed the problem. The first attempt to fill the target failed and caused an ESR trip which in turn caused Hall=A and B to loose their magnets. Once the hall was closed we did ep measurements while waiting for the dipole fields to set. At 11:30 we started take 4He data.
Data Entry by: D. Higinbotham