    Log entry time 00:12:39 on April 10, 2000

    Entry number 38491

    keyword=Beam Time Accounting
    Hall A

    4/9/2000 1600-2400
    Experiment #: E93-049
    Shift Leader: D. Higinbotham
    Shift Workers: K. Fissum, S. Dieterich

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0 0 0 0 15 1 1 1 3.25
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    1 1 1 1 45 0 0 0 4.75
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    0 0 0 0 15 1 1 1 3.25
    Planned Config-
    uration Change
    1 1 1 1 45 0 0 0 4.75
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Acq 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Start of the shift during the target change. During the change a venting of Hadron Q1 was seen. Ed Folz et at. was called in and fixed the problem. The first attempt to fill the target failed and caused an ESR trip which in turn caused Hall=A and B to loose their magnets. Once the hall was closed we did ep measurements while waiting for the dipole fields to set. At 11:30 we started take 4He data.

    Data Entry by: D. Higinbotham