• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name S. Strauch

    Log entry time 03:24:19 on April12,2000

    Entry number 38956

    keyword=FFP HV trip

    There were two FPP HV trips until 03:00 (channel 7.1.4). We checked the FPP gas
    in the gas shed but found no problems: Manometer reading 14 PSI, ball 7.7 units.
    HAC GAS FLOW reading: FPP1 - FPP4: 5.5, 5.5, 3.1, 3.6 l/h

    Since 03:00 the channel is up again and the current for channel 7.1.4
    is 0.45 uA @ 40 uA beam current and 4He target.

    --------
    [Thanks to Xiaodong and Mark to help to get access to HAC13]