Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen
Log entry time 21:28:26 on April27,2000
Entry number 40040
keyword=Spectrometers are set for Q2=2.6 GeV2
We started to setup the spectrometers to be ready for beam.
For Q2=2.6 (GeV/c)2, we have set e-arm angle to 27.081
and h-arm angle to 36.197.
The electron arm bogies control communication was not working and
called (tech on call) Rusty and he came in reset the IOC and it works now.
We also set the electron momentum to 2.7966 GeV/c (cycled Q2, Q3).
Set the hadron momentum to 2.1588 GeV/c (cycled Q2, Q3).