• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name tforest

    Log entry time 11:43:41 on April29,2000

    Entry number 40241

    keyword=BCM calibration

    Began BCM calibration procedure, data recorded in run 1946.

    Slight deviation from procedure. the current was ramped down from 50uA to 1uA by retracting slits, the last 2 low current points were taken with open slit. The 3 70uA on/off measurements were done last.