    User name S. Frullani

    Log entry time 15:55:30 on May12,2000

    Entry number 41163

    keyword=Shift Summary

    08:30 start change Wien filter angle - End false asymmetry measurement.
    08:45 Wien filter angle changed. Ready to send polarized beam.
    08:57 Start Ac measurements for Ph = 0.8183 GeV I=45 microA
    09:25 End first part of Ac (0.8183) measurement. - Start Moller measurement.
    10:12 No beam : Machine investigates why beam quality is poor on request of Hall B.
    10:47 Beam back. Moller measurement resumed.
    12:25 Start alarm on traget . Called Michael and Jian Ping
    12:40 End Moller measurement Result : 80.2+-0.3+-3.
    13:10 Target O.K. Request beam : 45 microA
    14:22 E-Arm S2-2-R no adc and tdc, channel 2.7 lost HV, enable it, the new data is ok.
    14:55 Beam off (MCC says back in 15 min).
    15:35 MCC calls : no beam for at least an other 1/2 hour.