    User name meek

    Log entry time 21:31:10 on May18,2000

    Entry number 41291

    keyword=Target cooldown and survey.

    Target is cooled down. There is 25 psia of H2 in loop 2. Temperature is 19K and the JT is set at 28%. The target vacuum is ~0.5E-7 TORR.

    A line of site survey was done on the target (with the empty position in the beam) after cooldown. The movement in Z (along the beam with + towards the beam dump) was -0.46 mm. The movement in Y (verticle in hall + going up) was -0.07 mm.