• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Ransome

    Log entry time 23:56:56 on June 1,2000

    Entry number 42819

    keyword=Shift Summary

    16:00 Swing shift starts.
    16:47 beam off, RF problems
    17:42 MCC is going to send pulsed beam to hall A. I<8uA with raster on for tuning.
    17:46 MCC is going to send the test CW beam to Hall A
    17:52 Stable beam back to Hall A (50 uA)

    Kin. production(135,180)

    LH2 15cm

    Time Run# Total # of evts Comment
    16:40 1667 1M (5min) trigger study run, ps2=500, ps4=450,need to redo it.
    17:52 1668 trigger study run,ps1=ps2=ps3=ps4=1

    17:57 1669 0.53M Good run
    18:34 1670 1.25M Good run
    19:54 1671 1.25M Good run
    21:14 1672 1.25M Good run 22:34 1673 0.9M Good run
    23:31 1674 still running