0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 1.0 | 1.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.33 | 2.33 |
Beam Available but Not in Use | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Beam Not Available or Unacceptable | 0 | 0 | 1.0 | 1.0 | 1.0 | 1.0 | 1.0 | 0.67 | 5.67 |
Accelerator Con- figuration Chage | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Experiment Ready | 1.0 | 1.0 | 0.0 | 0.0 | 0.0 | 0.5 | 1.0 | 1.0 | 4.5 |
Planned Config- uration Change | 0 | 0 | 1.0 | 1.0 | 1.0 | 0.5 | 0 | 0 | 3.5 |
Unplanned Experiment Down | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Hall not ready reasons | |||||||||
Target | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSe | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
HRSh | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Data Ac | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Comments: Planned to change hadron spectrometer angle and field and do trigger tests while the laser spot was being moved on the wafer. Accelerator problems extended the downtime for most of the remainder of the shift.
Data Entry by: Calarco