• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name adaq

    Log entry time 16:02:26 on June 2, 2000

    Entry number 42883

    keyword=Beam Time Accounting
    Hall A

    6/2/2000 0800-1600
    Experiment #: ndelta
    Shift Leader: Calarco
    Shift Workers: Ransome, Milbrath, Chudakov

    08000900100011001200130014001500Total Time
    Acceptable Beam
    in Use
    1.0 1.0 0.0 0.0 0.0 0.0 0.0 0.33 2.33
    Beam Available
    but Not in Use
    0 0 0 0 0 0 0 0 0
    Beam Not Available
    or Unacceptable
    0 0 1.0 1.0 1.0 1.0 1.0 0.67 5.67
    Accelerator Con-
    figuration Chage
    0 0 0 0 0 0 0 0 0
    Experiment
    Ready
    1.0 1.0 0.0 0.0 0.0 0.5 1.0 1.0 4.5
    Planned Config-
    uration Change
    0 0 1.0 1.0 1.0 0.5 0 0 3.5
    Unplanned
    Experiment Down
    0 0 0 0 0 0 0 00
    Hall not
    ready reasons
    Target 0 0 0 0 0 0 0 0 0
    HRSe 0 0 0 0 0 0 0 0 0
    HRSh 0 0 0 0 0 0 0 0 0
    Data Ac 0 0 0 0 0 0 0 0 0
    Other 0 0 0 0 0 0 0 0 0

    Comments: Planned to change hadron spectrometer angle and field and do trigger tests while the laser spot was being moved on the wafer. Accelerator problems extended the downtime for most of the remainder of the shift.

    Data Entry by: Calarco