Main INDEX
Monthly INDEX
PREV
NEXT
User name Templon
Log entry time 08:10:57 on June 5,2000
Entry number 43158
keyword=running shift summary
Run 1792 ... 1.20 M, stopped due to problems with an RF cavity
.
beam down for about 1 hr with cavity problems leading ultimately to
... "resetting energy of linac"
.
Run 1793 ... 1.25 M
... during 1793, accelerator had a DAC fail and fast feedback was off for
... on the order of a few minutes. They say that they don't always catch
... it, so this should be a normal activity during shift (checking the feedback
... on the MEDM screen)
.
Run 1794 ... 1.25 M
Run 1795 ... 1.25 M
...
... moving to pointing studies at 4:20, don't want to risk problems with
... beam at end of shift (hard cutoff of 8 AM).
..
Run 1796 ......... 12C target, no raster, 5 uA.... 263 k events
Run 1797 ..... 4 cm dummy, no raster, 5uA ... 230 k events
Run 1798 ... 15 cm dummy, no raster, 5uA ... 288 k events
Run 1799 ... 10 cm dummy, no raster, 5uA ... feedback was off, stop
Run 1800 ... 10 cm dummy, no raster, 5uA ... 310 k events
... move back to carbon target to do HARP scan.
.
Run 1801 ... HARP scan. harp run number 926
.. move back to LH2 target 15 cm to resume production run
.
Run 1802 ... production data, 42.5 uA ... 0.91 M events. Stopped by ROC14
.................... disconnection.
.
Run 1803 ... 1.25 M
Run 1804 ... 1.06 M
.
at 8 AM, MCC is not yet ready to take beam away, so we continue in
principle. in practice they are having cavity problems, so at 8:10 AM
no beam.