start of shift: Q3 off, Joe M doing ep energy measurement
9:50: called for controlled access, Ed Folts et al going in for more
magnet work...
13:05 Ed calls up and says we are fixed...
13:30 Ask for beam back...
13:55 start using beam
time run events comments
2035 bad prescales
2036 C pointing run
2037 HARP scan run with carbon in, end of run
saved late, after target move to 4 cm started
2038 4cm dummy pointing run
2039
realize spectrometer set to 53.79, should be 53.65, reset it...
2040 15 cm dummy pointing run
2041 carbon pointing run
2042 4 cm dummy pointing run
3:05-3:27: RF cavity dead, being bypassed
2043 10 cm dummy pointing run
set collimators to 6 msr each arm
2044 spot check, setup for efficiency test
15:40 2045 pion prodcuction / efficiency test at 5 ua
don't quite make it to start of production data by end of shift,
but Q3 looks to be fixed...