Main INDEX
Monthly INDEX
PREV
NEXT
User name ransome
Log entry time 00:00:04 on June16,2000
Entry number 43885
keyword=shift summary
Shift start with beam still off
16:10 Ed Folts calls and says termperature in hadron hut is 90 F.
Plant engineering came, fixed relay contact on AC
17:45 Hall closed up
18:05 beam back with 2 uA for Compton checks
18:10 Compton checks done -
18:18 Beam back at 70 uA, start running!
18:35 beam problems, go to low current for a minute
18:40 back on
Run Events Comment
2101 1.3 M
2102 1.3 M
2103 1.3 M
2104 1.3 M
2105 1.3 M
2106 1.3 M
2107 1.3 M
2108 1.3 M
2109 1.3 M
2110 1.3 M
2111 1.3 M
2112 1.3 M Very stable running. No beam trips in the last hour.