NEXT
User name gilman
Log entry time 00:02:40 on June17,2000
Entry number 43976
keyword=shift summary swing june 16, 2000
Arrive to find 107 uA on target and runs take 12 minutes. Yikes!
time run events comments
15:57 2134 0.7 M stop at 16:07 - IOC lost, ~15 minutes to reboot
16:35 2135 1.3 M good run
16:55 2136 1.3 M "
17:10 2137 1.3 M "
17:25 2138 1.3 M "
17:40 2139 1.3 M "
17:56 2140 1.3 M "
18:14 2141 0.3 M thunderstorm passing, induces electrical noise
causing RF trips, beam off and on a lot this run
19:15 AES still investigating, 1 zone with low cooling water fault, not coming
back up, +20 minutes from when it recovers...
20:00 problem remains with low conductivity water system, expert on way in,
magnetsd need to be cycled, expect at least 45 min -> 1 hour
20:40 beam back, on and off...
20:40 2142 test raster ...
20:54 2143 1.3 M good run
21:10 2144 1.2 M ", stop early since cavity lost at 21:25
21:32 beam back...
21:34 2145 1.3 M "
21:54 2146 1.3 M "
22:10 2147 1.3 M "
22:28 2148 1.3 M "
22:44 2149 0.9 M ", but roc14 crash at ~22:57?
roc 14 gui reset + coda reset seem to work...
2150 junk, coda bad - kill coda and restart on adaqs2 -
it had been going on adaqs3
23:11 2151 1.3 M "
23:28 2152 1.3 M "
23:45 2153 - still going at end of shift
Current down to 95 microamps at end of shift.
beam position on target not as stable as we would like, but within specs,
called MCC about it several times..