Log entry time 08:06:20 on June17,2000
Entry number 44011
keyword=Owl shift summary
00:00 Start owl shift. Continue taking data for kin(135,180).
Beam current 93uA.
02:58 Beam tripped because of the RF problem in north linac.
03:30 MCC told us they have some HV problem and the on-call person
is on the way. It may take one hour to fix that problem.
04:30 The target coolan pressure is fluctuating and increasing to the
set HIGH limit.
See halog 43999.
05:15 Beam back to Hall A. Ask for 50 uA beam current to avoid the overpressure of the coolant.
Tried to increase the coolant back to its original flow rate, its pressure
also went up. Since the target oncall doesn't know how to get rid
of this coolant pressure problem and MCC can't solve this probelm for us either,
we just keep data taking at a lower beam current (50uA) so that the coolant flow can
be set to 30 and the coolant pressure is not increasing any more. The experts should
be called to check this problem during the day.
06:57 Open the JT valve to 33, its pressure looks stable now (54.6). Ask MCC
to increase current to 60uA.
07:45 Ask MCC to increase current to 70uA since the coolant pressure is stable
at this flow rate.
Time Run Events Comment
23:47 2153 1.3M 93uA
00:04 2154 1.3M
00:21 2155 1.3M
00:39 2156 1.3M
00:57 2157 1.3M
01:12 2158 1.3M
01:32 2159 1.3M
01:50 2160 1.3M
02:08 2161 1.3M
02:25 2162 1.3M 90uA
02:43 2163 0.5M RF problem in north linac
05:15 2164 1.3M I_beam=50uA
05:57 2165 1.3M 50uA
06:39 2166 1.3M Beam current is increased to 60uA at 6:57.
07:08 2167 1.3M 60uA, at 7:45 increased to 70uA
07:47 2068