User name sarty
Log entry time 03:39:07 on June19,2000
Entry number 44237
This entry is a followup to: 44228
keyword=harp scan - beam ok now
The RF separator phase was "tweaked" to ensure proper matching of "our" beam
and the "nominally Hall C" beam buckets - all looks ok now.
Harp Scan 937 (coda run 2259) results below.
Your choice? (def= 8):
Survey offsets: X(5)= 0.16 Y(5)=-0.08 X(6)=-0.28 Y(6)=-0.12 mm
***************************************************************
Uncorrected Corrected Sigma
Base
position position Width
Width
Scanner #5 4ax: -316.0um -156.0um 82.0um
Scanner #5 4ay: -937.00um -1017.00um 73.2um
Scanner #6 4bx: -495.00um -775.00um 65.0um
Scanner #6 4by: 665.00um 545.00um 79.5um
***************************************************************
Uncorrected Corrected
position position
Target x pos : -527.23 um -886.46 um (+ for beam left)
Target y pos : 953.47 um 826.27 um (+ for too high)
Beam h angle: 0.03 mrad 0.10 mrad (+ for clockwise)
Beam v slope: 0.26 mrad 0.25 mrad (+ for ascending slope)
***************************************************************
FIGURE 1