Main INDEX
Monthly INDEX
PREV
NEXT
User name Ole Hansen
Log entry time 08:00:40 on June21,2000
Entry number 44499
keyword=Shift summary
Started shift with production running at (-90,180) kinematics.
1:40 MCC takes beam away for a few minutes for beam quality checks since Hall B is complaining.
1:55 Beam returns. 94uA.
2:02 Beam trips, MCC trying to improve things. OTR check.
3:18 Beam dies, RF cavity problem.
3:35 Beam is back.
4:20 Flaky beam for a while (3-5 minutes), eventually stabilizes.
4:40 More beam trips. Not very stable. MCC still sending 89uA.
6:30 Current slowly dropping. Now at 86uA.
7:00 Beam is more stable now. Trips are rare.
7:05 ROC14 dies and takes runcontrol with it. Restarting CODA.
7:11 Beam off. RF trip, qe checks.
7:17 Beam back.
7:25 The beam trips are back
7:55 Stable beam now
Mostly smooth running. Beam somewhat unstable for much of the night.
Run Events Comments
2354 1.3M 100uA current!
2355 1.3M 50uA for a few minutes
2356 1.3M
2357 1.3M
2358 1.3M
2359 360k Beam off for OTR tests (Hall B is unhappy)
2360 1.3M 94uA
2361 1.3M
2362 1.3M
2363 1.3M
2364 42k Short run, beam off
2365 1.3M
2366 1.3M
2367 1.3M Frequent beam trips
2368 1.3M
2369 1.3M
2370 1.3M
2371 1.3M 86uA
2372 1.3M
2373 1.3M
2374 370k ROC14 crash, short run
2375 290k Beam off
2376 1.3M
2377 1.3M 84uA
about 2.2C this shift