NEXT
User name Kelly
Log entry time 16:14:18 on June24,2000
Entry number 44817
keyword=day shift summary
0800 moving spectrometer and setting fields
0820 start pointing sequence for parallel kinematics
0930 start production running
1315 frequency of trips increasing
run target&conditions
==== =================
2499 harp, no raster, 5 uA carbon; harp scan 944
2500 carbon pointing, no raster 5 uA, open collimators
2501 4 cm dummy, no raster, 5 uA
2502 15 cm dummy
2503 10 cm dummy; moved 6in carbon door in also
2504 LH2, 6 msr, 80 uA, ps1-4=1,ps5=10000; trigger efficiency check
09h30 start production:
hadron angle = 42.305, p0=1.3782, doors: 1.5,3,6,9
collimators: 6msr
run events comment
===== ===== ===========
2505 1.3 M 6 msr in both, all doors, 80 uA
2506 1.3 M
2507 1.3 M open collimators
2508 1.3 M
2509 1.3 M
2510 1.3 M
2511 1.3 M
2512 in progress as shift ends