• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Kelly

    Log entry time 16:14:18 on June24,2000

    Entry number 44817

    keyword=day shift summary




    0800 moving spectrometer and setting fields
    0820 start pointing sequence for parallel kinematics
    0930 start production running
    1315 frequency of trips increasing

    run target&conditions
    ==== =================
    2499 harp, no raster, 5 uA carbon; harp scan 944
    2500 carbon pointing, no raster 5 uA, open collimators
    2501 4 cm dummy, no raster, 5 uA
    2502 15 cm dummy
    2503 10 cm dummy; moved 6in carbon door in also
    2504 LH2, 6 msr, 80 uA, ps1-4=1,ps5=10000; trigger efficiency check

    09h30 start production:
    hadron angle = 42.305, p0=1.3782, doors: 1.5,3,6,9
    collimators: 6msr

    run events comment
    ===== ===== ===========
    2505 1.3 M 6 msr in both, all doors, 80 uA
    2506 1.3 M
    2507 1.3 M open collimators
    2508 1.3 M
    2509 1.3 M
    2510 1.3 M
    2511 1.3 M
    2512 in progress as shift ends