User name Jack
Log entry time 14:22:00 on June25,2000
Entry number 44892
keyword=Beamline HV crate (crate 2)
When the beamline crate was swapped out the Arcnet address was not set to the
correct value. It should be set to 2. It was set to 3. The Electron arm top HV
crate is Arcnet address 3. There may have been some problems generated because
of this. The Electron Arm and Beamline high voltage settings should be checked to
ensure they are at their correct settings. The Beamline crate is now set to address 2.