    Log entry time 14:22:00 on June25,2000

    Entry number 44892

    keyword=Beamline HV crate (crate 2)

    When the beamline crate was swapped out the Arcnet address was not set to the
    correct value. It should be set to 2. It was set to 3. The Electron arm top HV
    crate is Arcnet address 3. There may have been some problems generated because
    of this. The Electron Arm and Beamline high voltage settings should be checked to
    ensure they are at their correct settings. The Beamline crate is now set to address 2.