User name Z. Chai
Log entry time 23:58:18 on June27,2000
Entry number 45035
keyword=Swing shift summary
16:00 Start swing shift. Still having gas problem.
Mark and Jack are trying to fix the problem.
The FPP straw efficiency is slowly getting better. But VDC efficiency
19:35 MCC told us they are having RF problem.
19:43 Beam back.
Adjusting the epics bpm offsets to make the epics beam position agree with
the spot++ result.
19:58 Beam tripped due to RF problem( South Linac RF problem)
20:38 MCC told us they are ready to send the beam to Hall A. Ask MCC to adjust
the BPM Y offsets.
22:05 Beam back to Hall A (76uA) . With the new bpm offsets for EPICS, the spot++ position agrees with the MCC's set position(from the EPICS).
From the HANA replay results, the H-Arm VDC efficiency looks fine(as good as before the gas problem), E-Arm VDC efficiency is also better than before.
22:52 Beam off (RF problem)
23:29 Beam back.
ET problems happened several times. Same problem as before.
Time Run# Events Charge Comment
16:19 2576 1.22M 167mC
17:11 2577 0.22M 29mC
17:23 2578 1.3M 179mC
18:08 2579 1.3M 179mC
19:00 2580 1.0M 144mC
19:49 2581 0.12M 16mC
22:10 2582 1.07M 146mC FPP straw efficiency back to normal level
23:29 2583