July 10 day shift:
Main task: Spin Dance
Parasitic: Pion/positron background study and DVCS test
8:00-8:30 Moller checkout
8:30-10:45 Beam tuning for Compton
10:45-12:30 Compton checkout + DVCS and pion parasitic runs
12:30-15:00 Beam off (problem with beam line dipole and Mott run)
Removed DVSC detector at the e-arm side
15:00-16:00 Beam back Compton and Pion test (completed 1.5 GeV,
started 0.9 GeV at 45 degree).