• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name jpchen

    Log entry time 16:07:34 on July10,2000

    Entry number 45503

    keyword=shift summary

    July 10 day shift:
    Main task: Spin Dance
    Parasitic: Pion/positron background study and DVCS test
    8:00-8:30 Moller checkout
    8:30-10:45 Beam tuning for Compton
    10:45-12:30 Compton checkout + DVCS and pion parasitic runs
    12:30-15:00 Beam off (problem with beam line dipole and Mott run)
    Removed DVSC detector at the e-arm side
    15:00-16:00 Beam back Compton and Pion test (completed 1.5 GeV,
    started 0.9 GeV at 45 degree).