• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Ole Hansen

    Log entry time 07:55:10 on July13,2000

    Entry number 45693

    keyword=Shift Summary


    00:05 Beam arrives shortly after start of shift. Start run 2847 with 6msr collimators.
    01:00 Moving collimators out.
    01:30 Beam troubles. Fast Feedback causes beam to trip. Unstable beam.
    Running without FF for a while. MCC calls expert.
    02:30 Beam relatively stable at 18uA with FF on.
    03:10 Beam goes away for aperture checks. MCC can't run Halls A and C
    simultaneously. 
    05:10 MCC thinks they have traced the beam problems to flaky Hall C beamline
    monitors. No stable beam for us yet, though ...
    05:40 Beam comes back. 34uA, nice and stable.
    07:35 MCC takes beam for "10 minutes" to let experts work on Hall C issues.
    07:55 Beam being restored.


    Time Run Events Comments
    00:04 2847 1.4M 6msr collimators in
    01:05 2848 -- junk
    01:13 2849 773k collimators open; FF frequently off; many beam trips
    02:14 2850 1.3M FF frequently off, probably not worth analyzing
    03:09 2851 -- junk
    05:04 2852 226k Unstable beam, short run, junk
    05:40 2853 1.8M Good stable beam at last
    06:45 2854 1.5M
    07:19 2855 802k